Tunnel Lining Materials
Tunnel Linings: Explore flexible lining materials and panel joining considerations. Confirm the lining function and project specification before material selection.
Material references
Use these grades as a starting point. Confirm the construction and configuration against your application.

- Weight
- 650g(±10g)/sqm
- Thickness
- 0.5mm
- Width
- 1.02m-5.0m
- Base fabric
- 1000D

- Weight
- 850g(±10g)/sqm
- Thickness
- 0.7mm
- Width
- 1.02m-5.0m
- Base fabric
- 1000D

- Weight
- 1100g(±10g)/sqm
- Thickness
- 0.9mm
- Width
- 1.02m-5.0m
- Base fabric
- 1300D
Tunnel Linings in use
Review material references for tunnel wall and roof linings. Identify the lining function, support arrangement and project specification separately from ventilation curtains.



Include in your brief
- Part dimensions, target roll width and production quantity
- Joining, cutting, printing and assembly methods
- Service conditions and required test methods
- Surface finish, colour and any fixed specification values
Define the application.
Describe where the lining sits within the system and how it is supported and joined. Tunnel lining and ventilation curtains have different jobs; identify the function your material needs to perform.
Related applications
Material briefs for tunnel wall and roof linings
Describe the lining location, supports and function within the tunnel project. A wall or roof lining and a curtain used to direct ventilation air have different purposes. Include panel sizes, fastening layout and project tests. The listed material references support grade review, while the installation and approvals require their own assessment.
Project drawings should show how panels meet supports, penetrations and neighbouring materials. Share a reference specification or existing lining sample when matching a construction. Review the proposed sample with the joining and fixing details used by your installation team.
Send the target grade, width, colour, quantity and destination for pricing. Ask about samples for appearance and fabrication checks, attaching the project test schedule where available. Sample size, charges and courier arrangements will be confirmed for the proposed construction.
